Wednesday, September 30, 2009

All of a sudden


Last week I put tile on the hearth and the paint elfs (my parents) stopped by to help with the living room. Once the inspector gives the okay for the fireplace the wall around it can be finished with tile and all that will be left is the floors. Well, and the door trim, and the french door needs some work, and the cabinet doors are still in progress, and the breakfast bar hasn't been started. Well it looks a lot closer to being done anyway. Put the order in for the maple floor today. The day of having a living room is near.

Tuesday, September 1, 2009

Grout



The thing about grout is that once you start there is no stopping. Even two hours into it when you don't think that you can hold your arm up anymore there is no break because there is a time limit. Once the grout hardens it better be where you want it to be. I tried something new, it was a sealer that got added to the grout instead of water. It had very specific instructions on not adding more liquid but the bottle didn't have enough liquid for the grout mix. The thicker grout is mixed the more difficult it is to get it in the gaps between the tiles. All that is past now and there are only a few minor problems that will get fixed by the matching caulk that came with it.

Thursday, July 30, 2009

Cabinet and tile progress.


In my typical style a little of everything has been worked on with nothing finished. Some of the face frames have been stained, varnished and installed. It is hard to tell be the cabinet on the right has a face frame. The tile back splash design was finally decided on and almost half of the tile has been laid. The kitchen might actually be done by the end of August, yay! The big project for Saturday is to replace the 8'x5' living room window.

Saturday, May 2, 2009

2 short


Ran out of mastic with only two tiles left to install. Big milestone though. My parents were by today to help and we got the island moved out. Time to cut into the floor tiles to get the new island going. This time done right...

Wednesday, April 1, 2009

Pseudo


Got the tile for the kitchen counter. Haven't really made much progress, I've been distracted. But I did get a pear tree, a cherry tree and a black berry bush. As soon as the snow melts I'll be able to plant them too.

Edit 4/09: What the hell is pseudo suppose to mean?

Wednesday, November 26, 2008

Monday, November 17, 2008

Tile, walls, walls and more walls

A lot of progress was made last weekend. Most of the shower tile is in, the soap dish was the wrong color so that isn't tiled in yet. The cement board for the floor tile was installed. The walls are damn close to being ready for texture too. Putting the mud on the walls took me about 20 hours, sanding and sponging down the topping compound took me, my parents and the gf about 30 total hours and there is about 5 or so hours of work left. That was just for two bedrooms and a bathroom. There is a refrigerator (cooling beer and leftovers at the moment) plus an oven and dish washer that aren't connected yet. On top of all the progress last weekend cost considerably less than the previous weekend buying appliances and there is internet at the house. The WHOLE internet! The biggest disappointment to the weekend was that the 3 doors I'd spent so long hanging and trying to get perfect are out of alignment again... time for the hand planner...





As for the shrinking list,

o Bath tile Soap dish
o Smooth bedroom walls
o Bathroom ceiling
o Bathroom floor cement board and tile
o Texture bedrooms
o paint bedrooms/bathroom
o Half bath door
o Laundry/half bath wall
o Drywall hallway/half bath
o Mud/smooth laundry/hallway walls
o Laundry floor cement board/tile
o Texture/paint hallway and laundry room


By the end of tomorrow I'm hoping to be ready for texturing.