Showing posts with label todo list. Show all posts
Showing posts with label todo list. Show all posts

Monday, December 1, 2008

Check, check, check

The list is looking better but not as far as I was hoping. Moved into the house on Saturday but the laundry room and hallway still need a lot of work. Oh, and those pesky toilet/vanity things, they'll be installed this weekend. Once the laundry room is done there will be a easy way to divide the house so that dust doesn't get into the living area. Taking a shower in the bathroom felt good after all of the work that went into it. Being in the crawlspace this morning trying to figure out why the heater didn't work on the other hand did not feel so good.

o Bath tile Soap dish
o Smooth bedroom walls
o Bathroom ceiling
o Bathroom floor cement board and tile
o Texture bedrooms
o paint bedrooms/bathroom
o Half bath door
o Laundry/half bath wall
o Drywall hallway and laundry room
o Mud and smooth laundry and hallway walls
o Laundry floor cement board and tile
o Texture hallway and laundry room
o Paint hallway and luandry room

Here are a couple of before pictures in preparation of the finished pictures coming soon.


Monday, November 17, 2008

Tile, walls, walls and more walls

A lot of progress was made last weekend. Most of the shower tile is in, the soap dish was the wrong color so that isn't tiled in yet. The cement board for the floor tile was installed. The walls are damn close to being ready for texture too. Putting the mud on the walls took me about 20 hours, sanding and sponging down the topping compound took me, my parents and the gf about 30 total hours and there is about 5 or so hours of work left. That was just for two bedrooms and a bathroom. There is a refrigerator (cooling beer and leftovers at the moment) plus an oven and dish washer that aren't connected yet. On top of all the progress last weekend cost considerably less than the previous weekend buying appliances and there is internet at the house. The WHOLE internet! The biggest disappointment to the weekend was that the 3 doors I'd spent so long hanging and trying to get perfect are out of alignment again... time for the hand planner...





As for the shrinking list,

o Bath tile Soap dish
o Smooth bedroom walls
o Bathroom ceiling
o Bathroom floor cement board and tile
o Texture bedrooms
o paint bedrooms/bathroom
o Half bath door
o Laundry/half bath wall
o Drywall hallway/half bath
o Mud/smooth laundry/hallway walls
o Laundry floor cement board/tile
o Texture/paint hallway and laundry room


By the end of tomorrow I'm hoping to be ready for texturing.