Monday, November 17, 2008

Tile, walls, walls and more walls

A lot of progress was made last weekend. Most of the shower tile is in, the soap dish was the wrong color so that isn't tiled in yet. The cement board for the floor tile was installed. The walls are damn close to being ready for texture too. Putting the mud on the walls took me about 20 hours, sanding and sponging down the topping compound took me, my parents and the gf about 30 total hours and there is about 5 or so hours of work left. That was just for two bedrooms and a bathroom. There is a refrigerator (cooling beer and leftovers at the moment) plus an oven and dish washer that aren't connected yet. On top of all the progress last weekend cost considerably less than the previous weekend buying appliances and there is internet at the house. The WHOLE internet! The biggest disappointment to the weekend was that the 3 doors I'd spent so long hanging and trying to get perfect are out of alignment again... time for the hand planner...





As for the shrinking list,

o Bath tile Soap dish
o Smooth bedroom walls
o Bathroom ceiling
o Bathroom floor cement board and tile
o Texture bedrooms
o paint bedrooms/bathroom
o Half bath door
o Laundry/half bath wall
o Drywall hallway/half bath
o Mud/smooth laundry/hallway walls
o Laundry floor cement board/tile
o Texture/paint hallway and laundry room


By the end of tomorrow I'm hoping to be ready for texturing.

Wednesday, November 12, 2008

Walls!

Just a few long-assed days ago the walls looked like this.




Then there was 3 days of doing nothing but smearing joint compound on the walls and now they look more like this. But not really since the picture was before the topping compount.



I've got some time off in two weeks. The house has to be ready to move in at the end of it. Texturing all of the walls, tiling the bathroom and getting carpet in the bedroom are all that is left to move in but by no means all that is left.

Wednesday, November 5, 2008

What's not is sight?


Like there being no 'i' in team there is no 'end' in sight. Work, work, work... Back in the attic to wire up lights for the closets. Back in the crawl space to wire up the hot water heater (yeah, not my first choice either.) It never seems to end. On the bright side most of the sheetrock is done and the bathroom is ready to mud, the heater works, there is insulation, the wiring is done, the closet has a door instead of a hole cut in the wall. Only 14 days for working on the house left for me before I've got to move in. Panic! I haven't even bought the tile yet.

Thursday, October 23, 2008

Drywall


There is new drywall hanging on some of the walls. It's a good feeling. Even though they are a blatant reminder of how much work putting up mud is they still look kinda like finished walls. Like progress instead of demolition. Don't get me wrong, there is still plenty of demolition going on. The kitchen and fireplace for example. But yeah, drywall, it's better than nothin'.

Thursday, October 16, 2008

inch by inch


The bathroom is finally ready to put the sheet rock back up. There is a new sub-floor and a new bath tub. There is a ceiling light and fan now too after hours in an attic with less than two feet of head room. The shower is going to get the new mold resistant yellow board and the rest of the room gets the regular green board. It seems like so much else has happened but it was mostly prep work and trying to track down the electrical wires. That involved putting a new hatch into the attic. The old one was no where near anything that needed to be accessed in the attic and in the middle of a bedroom. The new one is in the laundry room and near the wiring, the swamp cooler, even the heater flue. The tile I want for the bathroom floor has been hard to find. It looks like I'll have to order it off of the internet. White hexagon tile with black highlight tiles seems to be a restoration specialty that the blue and orange box stores or the tiles stores don't carry anymore.


Only 6 weeks left until I need to be living there. Ack!

Thursday, October 2, 2008

So much



The bathroom is gutted and ready to start being put back together. There was an elaborate window dance last weekend. Removed a small window from the second bedroom and put it into the half bath in place of the two single paned windows. Removed four single paned windows from the main bedroom and replaced them with two low-E energy star windows. All that also involved redoing all of the siding on that side of the house. There are two more windows that I want to replace and that will be it for the windows this year. After that nearly all of the drywall in the two bedrooms will be removed so that insulation can be put in the walls. That's right, there is no insulation in the walls. The attic could use some insulation too but first there is some wiring and fan vents to install. I've got seven weeks left to finish the remodel enough to move in. Kumbaya!

Sunday, March 16, 2008

jalepenos


It is hard to believe that this plant is over 5 years old. It has nearly died on a number of occasions but somehow it keeps powering on. I repotted it a couple of months ago and it has rewarded me with a bumper crop of jalapenos. Previously the bush had only produced four fruit total and now there are over ten at the same time! As you can see through the window winter is still in full force. About a month more of snow.