Thursday, August 19, 2010

Summer update

It didn't seem like much was getting done but I was wrong.

In July I took a 2 day class on straw bale construction. It was by the same teacher that taught the natural finishes class and although she has a lot of experience and is good with sharing it I was much happier about the hands on the other class had. The class used to be 3 day and losing a day was noticed. We did get to tour some pretty cool houses in various stages of construction.




Then the last of the siding was fixed. It doesn't look like much here but it is a vast improvement. Now the house can be painted. There was also an issue with the gutter that was leaking water back behind the soffit. I'm pretty sure the cause has been located and some flashing should fix the issue.





There is a curve in the transition between the kitchen tile and living room floor. This means that there is no way to buy a transition strip. The first thing that had to be done was that I had to make a decent router table. The straight pieces were pretty easy and although I've got to redo one that is too short they are essentially ready for varnish. The curved piece is a whole nother story. Probably should be it's own post once it is complete.





Some fun was had too. Got to go on two hikes so far this year. I'm looking forward to the kid getting old enough to come along. Next year or the year after?