The bathroom is gutted and ready to start being put back together. There was an elaborate window dance last weekend. Removed a small window from the second bedroom and put it into the half bath in place of the two single paned windows. Removed four single paned windows from the main bedroom and replaced them with two low-E energy star windows. All that also involved redoing all of the siding on that side of the house. There are two more windows that I want to replace and that will be it for the windows this year. After that nearly all of the drywall in the two bedrooms will be removed so that insulation can be put in the walls. That's right, there is no insulation in the walls. The attic could use some insulation too but first there is some wiring and fan vents to install. I've got seven weeks left to finish the remodel enough to move in. Kumbaya!