Re-did the plumbing for the hot and cold to the kitchen sink cabinet. I almost got away with reusing all of the parts for the new hot/cold lines but the tool for taking off the old PEX rings didn't fit into the fittings. Then after installing the cabinet up against the wall I realized that the cabinet actually needed to be a 1/4" to 1/2" an inch away from the wall on that side to due to a dip in the wall. Not sure how that is going to happen now. At least the valves are compression joints instead of soldered on. So tomorrow I get to spend half the day reworking what I spent all of yesterday doing. Well not all, I goofed off a lot yesterday. The other thing I've got to figure out is how to keep the wash tub that we have been using for a sink connected. Once the plywood for the counter is put on there isn't a whole lot of room. Maybe the sink will have to be hooked up after putting the plywood and cement board down in the same day. Wow, it's time to pick out the tile for the counter!